← Back to Job Board

Consultancy Services for Technical Supervision of Construction of 15 Blocks (60 Units) of VIP Latrines in Schools

European Committee for Agricultural Training

Kodich, Kapchok and Kiwawa Wards, Pokot North Sub-County, West Pokot County · contract

Posted 18 Nov 2026 · Apply by 25 Nov 2026

Apply

About

CEFA seeks a consulting firm to provide technical supervision for construction of 15 VIP-latrine blocks (60 units) in nine schools under the GROW project in West Pokot County. The assignment covers construction supervision and a Defects Liability Period, with a team including a Resident Engineer and two Inspectors of Works. The consulting firm must submit corporate, technical and financial proposal documents by email. Terms of service: At least three (3) months for Phase 1 (supervision of the construction works), and six (6) months for Phase 2 (Defects Liability Period). Duty station: Kodich, Kapchok and Kiwawa Wards of Pokot North Sub-County, West Pokot County.

How to apply

Create a free account to apply

Sign up and add a short profile, then see how to apply and open the official advert. We'll track every application for you, alert you to jobs like this one, and you'll apply faster next time.

About two minutes, and you come straight back to this job. Cazini never charges to apply.

Responsibilities

  • Safeguard the interests of CEFA under the Works Contract, in any manner related to the Works Contract and the proper execution thereof.
  • Review and comment on or approve the Contractor's work programme, method statements, proposals for materials sources and quality management plan, including testing laboratories and procedures for testing.
  • Be on site at all times during the construction and be present at all key stages of the work (foundations, materials delivery, concreting, testing and commissioning, etc.) to observe the progress and quality of the Contractor's work.
  • Check and establish that the Contractor mobilises and supplies to the site all materials, equipment and machinery committed in its bid, and ensure that all such items remain on site until their release has been authorised. Ensure that the Contractor properly records all equipment, materials and labo
  • Provide timely assistance and direction to the Contractor in all matters related to the interpretation or clarification of the Works Contract.
  • Issue instructions to the Contractor, in accordance with the authority specified in the Conditions of Contract, such that the works can proceed expeditiously.
  • Monitor progress against the programme, instructing the Contractor to revise its programme as necessary in order to meet the due completion dates.
  • Ensure that the works are executed in accordance with the drawings and that the quality of workmanship and materials complies with the technical specifications. Evaluate and determine the acceptability of substitute or "equal" materials and equipment proposed by the Contractor.
  • Liaise with communities and project-affected persons in relation to the works undertaken under the project; mediate any conflict or request between the Client, the Contractor, landowners or community members, and report to the Client in a timely manner.
  • Review and comment on, or recommend for approval, the Contractor's proposals for variations.
  • Prepare and submit reports on the progress of the works, the Contractor's performance, the quality of the works and the final reports after testing.
  • Review and certify all interim payment certificates submitted by the Contractor before forwarding them to CEFA.
  • Upon completion of the works, carry out the necessary inspection and propose to the CEFA team a date for a joint inspection.
  • Prepare the Completion Report, including verification of final quantities, outstanding or defective works, status of snag-list items and a recommendation to CEFA on provisional acceptance of the works and commencement of the Defects Liability Period. Where required, prepare the Certificate of Substa
  • Monitor the implementation of the Environmental and Social Management Plan (ESMP) through a checklist and ensure compliance with the environmental guidelines provided by CEFA.

Qualifications

  • The consulting firm must have qualified personnel with proven professional experience in the supervision of building and sanitation construction works.
  • As proof of experience and membership of the respective professional bodies, the Consultant is required to attach personnel registration / membership certificates and detailed CVs.
  • Minimum of a bachelor's degree in Civil Engineering, Water Engineering or equivalent from a reputable institution (must provide academic certificate).
  • Registered with the Engineers Board of Kenya (must provide EBK certificate).
  • Minimum of a National Diploma or higher in Civil Engineering or equivalent from a reputable institution (must provide academic certificate).
  • Registered with the Kenya Engineering Technology Registration Board (KETRB) and/or the National Construction Authority (NCA) and/or the Engineers Board of Kenya (EBK) (must provide registration certificate).
  • Over three (3) years' progressive experience as inspector of works in similar building-related works.